Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · (954) 807-3208
Romco BuildersCall

What we renovate · Guest Rooms

The Same Room, a Hundred Times

The core of most hotel renovations, and the one where repetition is the entire economic argument.

Key count, the scope you are facing, and your occupancy pattern. Those three tell us whether the program is achievable.

Occupied

Guests are inside the building while we work

Per key

The number that decides whether the project works

Shoulder

Florida seasonality dictates the program

Licensed

General contractor, licensed in the state of Florida

The first room costs what it costs

A guest room renovation is the same work repeated many times. The first room is slow, expensive and full of discovery. By the twentieth the crew has a rhythm and the cost per key has dropped substantially. Anything that breaks that rhythm — a design change, a rooms release, a delayed material — resets it and costs more than it appears to.

The mock-up also settles arguments that would otherwise recur. Once a room exists that the owner, the operator and the brand have all walked and approved, subsequent questions about a finish or a fitting have a physical answer rather than a drawing to interpret. That alone saves weeks across a large program.

What decides cost per key

  • How many rooms come out of service at once.
  • Repeatability, which design variation destroys.
  • Material delivery timed to the sequence, not to convenience.
  • What is found behind the walls in the first few rooms.
  • Whether the scope includes bathrooms, which changes everything.

What breaks the rhythm

A crew working through identical rooms develops a sequence and a pace, and cost per key falls as they do. Anything that interrupts it resets that: a design change, a material arriving late, a floor released in a different order, a room held back for a guest.

This is why operations releasing rooms unpredictably is expensive even when the total number released is the same. Continuity is worth more than volume on a guest room program.

How we handle it

  1. 01Build a mock-up room first and get it fully approved.
  2. 02Take out a floor or a stack at a time, agreed with operations.
  3. 03Sequence trades so each room moves continuously.
  4. 04Stage materials so nothing waits.
  5. 05Report cost per key as the program runs.

Build a full mock-up room and approve everything in it — finishes, fittings, joinery, the lot — before the first real room starts. A change agreed at room forty applies to the thirty-nine already done, and that is where guest room budgets go.

Said plainly

Where we stop

If operations will only release two rooms at a time, the cost per key rises substantially and the program extends. We will price the options honestly so the trade is a decision rather than a surprise.

FAQ

Common questions

How many rooms should come out at once?
As many as operations can release. Fewer rooms means higher cost per key and a longer program.
Why a mock-up room?
Because a change agreed at room forty applies to the thirty-nine already finished.
What makes cost per key rise?
Anything that breaks the repetition — design changes, small releases, late materials.
Do bathrooms change the number?
Considerably. They are the most disruptive part of a room.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.